Sponsor licenceSL-7K3M-29QD
PRODUCT DEMOExit demo
Latest inspection readiness score
81/100
Attention required
0Critical
1High
2Medium
3Low
34Checks passed
Algorithm: mock-inspection-v1Rule set: effective on inspection dateSynthetic demo result
Overdue duties1Reporting & deadlines
RTW failures0Pre-start evidence
Permission failures0Active sponsored people
Evidence gaps3Missing / unverified

Inspection findings

Findings are deduplicated by underlying risk for scoring, while the raw diagnostic checks remain available for audit transparency.

01
High

Worker circumstance report is overdue

Daniel Okafor

A recorded work-location change has an open UKVI reporting action beyond its calculated working-day deadline.

Corrective action

Review the underlying change, make the required report immediately if still outstanding, and retain the submission reference and evidence.

02
Medium

Salary evidence needs reconciliation

Chen Wei

The latest salary record has not yet been matched to retained payroll and bank-transfer evidence.

Corrective action

Verify the current salary against payroll evidence and the sponsored role record, then mark the evidence as verified with reviewer and date.

03
Medium

Current job description awaiting verification

Chen Wei

A replacement job description has been requested but is not yet verified in the sponsored-person file.

Corrective action

Retain and verify the current job description and confirm it remains consistent with the sponsored role.

Checks performed

The first inspection engine covers launch-critical controls.

✓Overdue reporting & compliance tasks
✓Right to work before employment start
✓Immigration permission expiry
✓Required evidence matrix
✓Critical record data quality

Scoring guardrails

The score is deliberately conservative.

CriticalAny open critical risk caps health below 50.
HighHigh-risk failures cap health at 74.
DeduplicatedRelated diagnostic failures count as one underlying risk.